{"id":"scheme-ss2-solar-photovoltaic-installation-maintenance","grade":"SS2","subject":"Solar Photovoltaic Installation & Maintenance","source":"https://drive.google.com/file/d/174BEzG6lNGAOsUtIU7g72VUqKl6WXXzu/view?usp=drivesdk","kind":"authored","chapters":[{"id":"SS2-830","term":1,"week":"1","title":"Term 1 · Week 1 — Review of SS1 Work","page":363,"focus":"Quick recap of solar basics & components","kind":"revision","teaching":{"id":"SS2-830","intro":"This is a worked recall session for Solar Photovoltaic Installation & Maintenance. Explain an idea without your notes, use it in an example, then check the method. The two cases below revisit selected concepts. Use the term topic list to plan wider revision.","steps":["Recall the first idea: A hybrid system combines PV with storage or another supply; a grid-tied inverter synchronises its output with the utility. Energy in Wh equals power in W multiplied by hours.","Apply and check the contrasting idea: Lithium-ion batteries store energy electrochemically and require a compatible battery-management system. Flow batteries circulate electrolytes from tanks; energy capacity and power rating are separate design considerations.","Compare the methods in the two worked cases. State which information selects each method and check the result against the question."],"scene":"In Lagos, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain advanced pv system design in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["A 200 W load runs for 5 hours: 200 × 5 = 1,000 Wh. This describes energy, not inverter surge capacity.","A 1 kW load and a 3 kW load cannot be judged by stored kWh alone: the discharge power limit must also be adequate."],"question":"A 150 W load runs for 4 hours. What daily load energy is needed?","options":["600 Wh","600 W","37.5 Wh"],"correct":0,"feedback":"Energy equals power multiplied by operating time: 150 W × 4 h = 600 Wh. W measures power; Wh measures energy.","practice":"A battery has 5 kWh nominal storage and a stated usable allowance of 70%. A load needs 2 kWh. Calculate usable energy and ideal surplus.","solution":"Usable energy = 5 × 0.70 = 3.5 kWh. Ideal surplus = 3.5 − 2 = 1.5 kWh. This excludes further losses and does not establish adequate discharge power.","mistake":"A common error is to ignore this distinction or condition: An ordinary grid-tied inverter stops supplying the grid during an outage because anti-islanding protects workers; backup requires an approved arrangement.","limitations":["This is an authored recall set, not an official examination or evidence that every topic has been mastered."],"sources":["https://www.energy.gov/cmei/systems/solar-photovoltaic-system-design-basics","https://www.energy.gov/cmei/systems/solar-integration-solar-energy-and-storage-basics"]},"text":"This is a worked recall session for Solar Photovoltaic Installation & Maintenance. Explain an idea without your notes, use it in an example, then check the method. The two cases below revisit selected concepts. Use the term topic list to plan wider revision.\n\nSTEP BY STEP\n\nRecall the first idea: A hybrid system combines PV with storage or another supply; a grid-tied inverter synchronises its output with the utility. Energy in Wh equals power in W multiplied by hours.\n\nApply and check the contrasting idea: Lithium-ion batteries store energy electrochemically and require a compatible battery-management system. Flow batteries circulate electrolytes from tanks; energy capacity and power rating are separate design considerations.\n\nCompare the methods in the two worked cases. State which information selects each method and check the result against the question.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Lagos, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain advanced pv system design in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nA 200 W load runs for 5 hours: 200 × 5 = 1,000 Wh. This describes energy, not inverter surge capacity.\n\nEXAMPLE 2\n\nA 1 kW load and a 3 kW load cannot be judged by stored kWh alone: the discharge power limit must also be adequate.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: An ordinary grid-tied inverter stops supplying the grid during an outage because anti-islanding protects workers; backup requires an approved arrangement.\n\nPRACTICE\n\nA battery has 5 kWh nominal storage and a stated usable allowance of 70%. A load needs 2 kWh. Calculate usable energy and ideal surplus."},{"id":"SS2-831","term":1,"week":"2","title":"Term 1 · Week 2 — Advanced PV System Design","page":363,"focus":"Hybrid systems, grid-tied calculations","kind":"lesson","teaching":{"id":"SS2-831","intro":"A hybrid system combines PV with storage or another supply; a grid-tied inverter synchronises its output with the utility. Energy in Wh equals power in W multiplied by hours.","steps":["Separate peak simultaneous demand from daily energy: inverter selection and battery sizing answer different questions.","Map when each source supplies the load and when charging occurs; this reveals unmet night demand.","Show utility interaction through a labelled approved interface, with professional design for protection and backup."],"scene":"In Lagos, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain advanced pv system design in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["A 200 W load runs for 5 hours: 200 × 5 = 1,000 Wh. This describes energy, not inverter surge capacity.","An ordinary grid-tied inverter stops supplying the grid during an outage because anti-islanding protects workers; backup requires an approved arrangement."],"question":"A 150 W load runs for 4 hours. What daily load energy is needed?","options":["600 Wh","600 W","37.5 Wh"],"correct":0,"feedback":"Energy equals power multiplied by operating time: 150 W × 4 h = 600 Wh. W measures power; Wh measures energy.","practice":"A shop uses two 15 W lamps for 6 hours and a 50 W fan for 4 hours. Calculate daily load energy.","solution":"Lamps: 2 × 15 × 6 = 180 Wh. Fan: 50 × 4 = 200 Wh. Total = 380 Wh/day, before system losses; inverter power requires a separate assessment.","mistake":"A common error is to ignore this distinction or condition: An ordinary grid-tied inverter stops supplying the grid during an outage because anti-islanding protects workers; backup requires an approved arrangement.","sources":["https://www.energy.gov/cmei/systems/solar-photovoltaic-system-design-basics"],"limitations":[]},"text":"A hybrid system combines PV with storage or another supply; a grid-tied inverter synchronises its output with the utility. Energy in Wh equals power in W multiplied by hours.\n\nSTEP BY STEP\n\nSeparate peak simultaneous demand from daily energy: inverter selection and battery sizing answer different questions.\n\nMap when each source supplies the load and when charging occurs; this reveals unmet night demand.\n\nShow utility interaction through a labelled approved interface, with professional design for protection and backup.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Lagos, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain advanced pv system design in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nA 200 W load runs for 5 hours: 200 × 5 = 1,000 Wh. This describes energy, not inverter surge capacity.\n\nEXAMPLE 2\n\nAn ordinary grid-tied inverter stops supplying the grid during an outage because anti-islanding protects workers; backup requires an approved arrangement.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: An ordinary grid-tied inverter stops supplying the grid during an outage because anti-islanding protects workers; backup requires an approved arrangement.\n\nPRACTICE\n\nA shop uses two 15 W lamps for 6 hours and a 50 W fan for 4 hours. Calculate daily load energy."},{"id":"SS2-832","term":1,"week":"3","title":"Term 1 · Week 3 — Solar Energy Storage Technologies","page":363,"focus":"Advanced batteries (Li-ion, flow batteries)","kind":"lesson","teaching":{"id":"SS2-832","intro":"Lithium-ion batteries store energy electrochemically and require a compatible battery-management system. Flow batteries circulate electrolytes from tanks; energy capacity and power rating are separate design considerations.","steps":["Compare nominal capacity with usable capacity, allowing for discharge limits and conversion losses.","Identify the matching charger and BMS requirements from the manufacturer's documentation, not chemistry alone.","Compare lifecycle cost, service support and operating conditions before assuming the newest chemistry is preferable."],"scene":"In Ibadan, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain solar energy storage technologies in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["A labelled 2 kWh battery with an assumed 80% usable allowance offers 1.6 kWh before further system losses.","A 1 kW load and a 3 kW load cannot be judged by stored kWh alone: the discharge power limit must also be adequate."],"question":"Which specification describes how quickly a battery may supply energy?","options":["Nominal capacity alone","Discharge power rating in kW","Stored energy capacity in kWh"],"correct":1,"feedback":"The correct answer is: Discharge power rating in kW. Compare nominal capacity with usable capacity, allowing for discharge limits and conversion losses.","practice":"A battery has 5 kWh nominal storage and a stated usable allowance of 70%. A load needs 2 kWh. Calculate usable energy and ideal surplus.","solution":"Usable energy = 5 × 0.70 = 3.5 kWh. Ideal surplus = 3.5 − 2 = 1.5 kWh. This excludes further losses and does not establish adequate discharge power.","mistake":"A common error is to ignore this distinction or condition: A 1 kW load and a 3 kW load cannot be judged by stored kWh alone: the discharge power limit must also be adequate.","sources":["https://www.energy.gov/cmei/systems/solar-integration-solar-energy-and-storage-basics"],"limitations":[]},"text":"Lithium-ion batteries store energy electrochemically and require a compatible battery-management system. Flow batteries circulate electrolytes from tanks; energy capacity and power rating are separate design considerations.\n\nSTEP BY STEP\n\nCompare nominal capacity with usable capacity, allowing for discharge limits and conversion losses.\n\nIdentify the matching charger and BMS requirements from the manufacturer's documentation, not chemistry alone.\n\nCompare lifecycle cost, service support and operating conditions before assuming the newest chemistry is preferable.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Ibadan, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain solar energy storage technologies in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nA labelled 2 kWh battery with an assumed 80% usable allowance offers 1.6 kWh before further system losses.\n\nEXAMPLE 2\n\nA 1 kW load and a 3 kW load cannot be judged by stored kWh alone: the discharge power limit must also be adequate.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: A 1 kW load and a 3 kW load cannot be judged by stored kWh alone: the discharge power limit must also be adequate.\n\nPRACTICE\n\nA battery has 5 kWh nominal storage and a stated usable allowance of 70%. A load needs 2 kWh. Calculate usable energy and ideal surplus."},{"id":"SS2-833","term":1,"week":"4","title":"Term 1 · Week 4 — Energy Efficiency in Solar Systems","page":363,"focus":"Energy conservation measures","kind":"lesson","teaching":{"id":"SS2-833","intro":"Energy conservation reduces demand; efficiency provides the same service with less input. Prioritise useful lighting, efficient appliances and unnecessary operating hours before increasing array size.","steps":["List each appliance's watts and daily hours to locate the largest energy uses.","Compare replacement appliances by useful service as well as nameplate power.","Recalculate the daily load after conservation measures so equipment is not sized for avoidable demand."],"scene":"In Ilorin, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain energy efficiency in solar systems in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["Replacing four 60 W lamps with four 10 W lamps saves 200 W; over 5 hours the saving is 1 kWh.","Switching a 100 W fan off for 3 unused hours saves 300 Wh without changing its efficiency rating."],"question":"Which change reduces energy without changing appliance efficiency?","options":["Increasing inverter capacity","Shortening unnecessary operating hours","Increasing the appliance wattage"],"correct":1,"feedback":"The correct answer is: Shortening unnecessary operating hours. List each appliance's watts and daily hours to locate the largest energy uses.","practice":"Six 40 W lamps are replaced with six 8 W lamps, used 5 hours daily. Calculate the daily saving.","solution":"Old use = 6 × 40 × 5 = 1,200 Wh. New use = 6 × 8 × 5 = 240 Wh. Saving = 960 Wh, or 0.96 kWh daily.","mistake":"A common error is to ignore this distinction or condition: Switching a 100 W fan off for 3 unused hours saves 300 Wh without changing its efficiency rating.","sources":[],"limitations":[]},"text":"Energy conservation reduces demand; efficiency provides the same service with less input. Prioritise useful lighting, efficient appliances and unnecessary operating hours before increasing array size.\n\nSTEP BY STEP\n\nList each appliance's watts and daily hours to locate the largest energy uses.\n\nCompare replacement appliances by useful service as well as nameplate power.\n\nRecalculate the daily load after conservation measures so equipment is not sized for avoidable demand.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Ilorin, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain energy efficiency in solar systems in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nReplacing four 60 W lamps with four 10 W lamps saves 200 W; over 5 hours the saving is 1 kWh.\n\nEXAMPLE 2\n\nSwitching a 100 W fan off for 3 unused hours saves 300 Wh without changing its efficiency rating.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: Switching a 100 W fan off for 3 unused hours saves 300 Wh without changing its efficiency rating.\n\nPRACTICE\n\nSix 40 W lamps are replaced with six 8 W lamps, used 5 hours daily. Calculate the daily saving."},{"id":"SS2-834","term":1,"week":"5","title":"Term 1 · Week 5 — Midterm Test","page":363,"focus":"","kind":"assessment","text":"SCHEDULED SCHOOL SESSION\n\nMidterm Test\n\n\n\nThis scheme entry schedules an assessment, break or closing session. It is not a new teaching topic. Your school sets its assessment arrangements. Use the earlier worked lessons to practise and explain corrections."},{"id":"SS2-835","term":1,"week":"6","title":"Term 1 · Week 6 — Safety in PV Installation","page":363,"focus":"Personal protective equipment (PPE), site hazards","kind":"lesson","teaching":{"id":"SS2-835","intro":"PV modules can produce voltage in daylight even when other supplies are isolated. Hazards include electric shock, DC arcs, falls, hot surfaces and lifting injuries; PPE complements isolation and work planning.","steps":["Identify the energy sources before considering protective clothing, because both PV and storage can remain hazardous.","Mark fall, trip, lifting and weather risks separately on a paper site map.","Use barriers, qualified supervision and an approved isolation procedure; pupils inspect only inert models."],"scene":"In Lagos, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain safety in pv installation in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["A paper site plan shows a wet walkway beside an inverter: mark the area as a slip and electrical hazard and stop access.","A roof with no assessed access system is not made safe merely by wearing gloves; qualified workers must plan fall protection."],"question":"A PV site's roof access is unsafe. What is the appropriate response?","options":["Proceed because the inverter is off","Stop access until competent fall protection is arranged","Proceed because rubber gloves are available"],"correct":1,"feedback":"The correct answer is: Stop access until competent fall protection is arranged. Identify the energy sources before considering protective clothing, because both PV and storage can remain hazardous.","practice":"A paper site map shows a wet path and an unprotected roof edge. Identify two different hazards and suitable controls.","solution":"The path presents slip and possible electrical exposure risks: restrict access and have the water/source assessed. The roof edge presents a fall risk: no access until competent workers establish an approved access and fall-protection plan.","mistake":"A common error is to ignore this distinction or condition: A roof with no assessed access system is not made safe merely by wearing gloves; qualified workers must plan fall protection.","sources":[],"limitations":[]},"text":"PV modules can produce voltage in daylight even when other supplies are isolated. Hazards include electric shock, DC arcs, falls, hot surfaces and lifting injuries; PPE complements isolation and work planning.\n\nSTEP BY STEP\n\nIdentify the energy sources before considering protective clothing, because both PV and storage can remain hazardous.\n\nMark fall, trip, lifting and weather risks separately on a paper site map.\n\nUse barriers, qualified supervision and an approved isolation procedure; pupils inspect only inert models.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Lagos, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain safety in pv installation in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nA paper site plan shows a wet walkway beside an inverter: mark the area as a slip and electrical hazard and stop access.\n\nEXAMPLE 2\n\nA roof with no assessed access system is not made safe merely by wearing gloves; qualified workers must plan fall protection.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: A roof with no assessed access system is not made safe merely by wearing gloves; qualified workers must plan fall protection.\n\nPRACTICE\n\nA paper site map shows a wet path and an unprotected roof edge. Identify two different hazards and suitable controls."},{"id":"SS2-836","term":1,"week":"7","title":"Term 1 · Week 7 — Midterm Break","page":363,"focus":"","kind":"assessment","text":"SCHEDULED SCHOOL SESSION\n\nMidterm Break\n\n\n\nThis scheme entry schedules an assessment, break or closing session. It is not a new teaching topic. Your school sets its assessment arrangements. Use the earlier worked lessons to practise and explain corrections."},{"id":"SS2-837","term":1,"week":"8","title":"Term 1 · Week 8 — Nigerian & International Standards","page":363,"focus":"SON, NERC, IEC standards","kind":"lesson","teaching":{"id":"SS2-837","intro":"SON concerns Nigerian standards and conformity, NERC concerns electricity-sector regulation, and IEC publishes international electrotechnical standards. Product conformity, installation quality and permission to connect are different checks.","steps":["Separate equipment product standards from installation requirements and electricity connection approval.","Record the issuing body, document title, edition and scope when checking a claimed standard.","Refer uncertain compliance claims to competent professionals; this lesson does not establish a current legal approval."],"scene":"In Ilorin, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain nigerian & international standards in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["A panel carrying a claimed test mark still needs traceable certification and an installation design; a printed logo alone is insufficient evidence.","A customer asking for grid export must obtain current utility and regulatory requirements before a designer promises connection."],"question":"Which body publishes international electrotechnical standards?","options":["IEC","NERC","A local electricity retailer"],"correct":0,"feedback":"The correct answer is: IEC. Separate equipment product standards from installation requirements and electricity connection approval.","practice":"A supplier shows a printed certification logo but no certificate number or traceable report. What evidence should a buyer request?","solution":"Request the certificate/report identifier, issuing conformity body, exact product model and standard/edition, then verify traceability. A logo alone neither proves conformity nor grants permission to connect a system.","mistake":"A common error is to ignore this distinction or condition: A customer asking for grid export must obtain current utility and regulatory requirements before a designer promises connection.","sources":["https://nerc.gov.ng/wp-content/uploads/2026/04/Mini-Grid-Regulations-2026.pdf"],"limitations":["Requirements depend on current jurisdiction, installation and authority. The 2025 scheme is a topic outline, not a compliance manual; no connection approval or regulatory eligibility is asserted."]},"text":"SON concerns Nigerian standards and conformity, NERC concerns electricity-sector regulation, and IEC publishes international electrotechnical standards. Product conformity, installation quality and permission to connect are different checks.\n\nSTEP BY STEP\n\nSeparate equipment product standards from installation requirements and electricity connection approval.\n\nRecord the issuing body, document title, edition and scope when checking a claimed standard.\n\nRefer uncertain compliance claims to competent professionals; this lesson does not establish a current legal approval.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Ilorin, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain nigerian & international standards in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nA panel carrying a claimed test mark still needs traceable certification and an installation design; a printed logo alone is insufficient evidence.\n\nEXAMPLE 2\n\nA customer asking for grid export must obtain current utility and regulatory requirements before a designer promises connection.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: A customer asking for grid export must obtain current utility and regulatory requirements before a designer promises connection.\n\nPRACTICE\n\nA supplier shows a printed certification logo but no certificate number or traceable report. What evidence should a buyer request?"},{"id":"SS2-838","term":1,"week":"9","title":"Term 1 · Week 9 — Electrical Codes & Regulations","page":363,"focus":"Wiring codes, safety compliance","kind":"lesson","teaching":{"id":"SS2-838","intro":"An electrical code sets requirements for installation safety; manufacturer instructions specify product limits. Cable selection depends on current, voltage drop, insulation, temperature, installation method and protection coordination.","steps":["Match cable insulation and enclosures to the environment as well as the circuit voltage.","Distinguish overcurrent protection from a manual isolating device: each has a different protective function.","Use a paper compliance checklist and current professional guidance rather than treating a sample wire size as universal."],"scene":"In Ile-Ife, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain electrical codes & regulations in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["A 12 V model losing 1 V in its cable loses 1/12 × 100 = 8.3% of source voltage, which signals an unsuitable illustrative design.","Two equal-current circuits in different thermal conditions may require different cable sizes; current alone cannot settle compliance."],"question":"Why can two equal-current cables require different sizing?","options":["Cable colour alone changes current capacity","Current always determines size without other information","Their installation and thermal conditions differ"],"correct":2,"feedback":"The correct answer is: Their installation and thermal conditions differ. Match cable insulation and enclosures to the environment as well as the circuit voltage.","practice":"A paper design has a 24 V source and a 0.6 V cable drop. Calculate percentage drop and explain why this is not a full compliance check.","solution":"Drop = 0.6/24 × 100 = 2.5%. Compliance also needs current capacity, protection, insulation, environment and current applicable requirements; the percentage alone cannot approve the design.","mistake":"A common error is to ignore this distinction or condition: Two equal-current circuits in different thermal conditions may require different cable sizes; current alone cannot settle compliance.","sources":["https://nerc.gov.ng/wp-content/uploads/2026/04/Mini-Grid-Regulations-2026.pdf"],"limitations":["Requirements depend on current jurisdiction, installation and authority. The 2025 scheme is a topic outline, not a compliance manual; no connection approval or regulatory eligibility is asserted."]},"text":"An electrical code sets requirements for installation safety; manufacturer instructions specify product limits. Cable selection depends on current, voltage drop, insulation, temperature, installation method and protection coordination.\n\nSTEP BY STEP\n\nMatch cable insulation and enclosures to the environment as well as the circuit voltage.\n\nDistinguish overcurrent protection from a manual isolating device: each has a different protective function.\n\nUse a paper compliance checklist and current professional guidance rather than treating a sample wire size as universal.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Ile-Ife, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain electrical codes & regulations in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nA 12 V model losing 1 V in its cable loses 1/12 × 100 = 8.3% of source voltage, which signals an unsuitable illustrative design.\n\nEXAMPLE 2\n\nTwo equal-current circuits in different thermal conditions may require different cable sizes; current alone cannot settle compliance.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: Two equal-current circuits in different thermal conditions may require different cable sizes; current alone cannot settle compliance.\n\nPRACTICE\n\nA paper design has a 24 V source and a 0.6 V cable drop. Calculate percentage drop and explain why this is not a full compliance check."},{"id":"SS2-839","term":1,"week":"10","title":"Term 1 · Week 10 — Practical: Grid-tied Solar Setup","page":363,"focus":"Demonstration with inverters and grid connection","kind":"lesson","teaching":{"id":"SS2-839","intro":"A grid-tied block diagram contains modules, DC protection/isolation, inverter, AC protection and the approved point of connection. Earthing and anti-islanding are essential design considerations.","steps":["Follow the DC-to-AC energy path on a block diagram and label the boundary between the two.","Identify the isolation and protective functions on both sides of the inverter without making connections.","Explain that utility permission and professional commissioning precede real grid interaction."],"scene":"In Lagos, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain practical: grid-tied solar setup in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["On a disconnected diagram, place the inverter between the DC array and AC distribution: it converts the form of electrical output.","When a mock grid disappears, mark export as stopped; this represents anti-islanding, not a permission to test a real connection."],"question":"What is the inverter's main conversion role in a grid-tied diagram?","options":["DC electricity to AC electricity","AC electricity to sunlight","Electrical energy directly into stored water"],"correct":0,"feedback":"The correct answer is: DC electricity to AC electricity. Follow the DC-to-AC energy path on a block diagram and label the boundary between the two.","practice":"On paper, arrange these blocks: approved connection, PV modules, inverter. State what must happen to ordinary export when the utility fails.","solution":"Energy path: PV modules → inverter → approved connection. Ordinary export must stop through anti-islanding; continued backup requires a separately approved design and cannot be assumed.","mistake":"A common error is to ignore this distinction or condition: When a mock grid disappears, mark export as stopped; this represents anti-islanding, not a permission to test a real connection.","sources":["https://www.energy.gov/cmei/systems/solar-photovoltaic-system-design-basics"],"limitations":[]},"text":"A grid-tied block diagram contains modules, DC protection/isolation, inverter, AC protection and the approved point of connection. Earthing and anti-islanding are essential design considerations.\n\nSTEP BY STEP\n\nFollow the DC-to-AC energy path on a block diagram and label the boundary between the two.\n\nIdentify the isolation and protective functions on both sides of the inverter without making connections.\n\nExplain that utility permission and professional commissioning precede real grid interaction.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Lagos, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain practical: grid-tied solar setup in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nOn a disconnected diagram, place the inverter between the DC array and AC distribution: it converts the form of electrical output.\n\nEXAMPLE 2\n\nWhen a mock grid disappears, mark export as stopped; this represents anti-islanding, not a permission to test a real connection.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: When a mock grid disappears, mark export as stopped; this represents anti-islanding, not a permission to test a real connection.\n\nPRACTICE\n\nOn paper, arrange these blocks: approved connection, PV modules, inverter. State what must happen to ordinary export when the utility fails."},{"id":"SS2-840","term":1,"week":"11–13","title":"Term 1 · Week 11–13 — Revision & Exams","page":363,"focus":"","kind":"revision","teaching":{"id":"SS2-840","intro":"This is a worked recall session for Solar Photovoltaic Installation & Maintenance. Explain an idea without your notes, use it in an example, then check the method. The two cases below revisit selected concepts. Use the term topic list to plan wider revision.","steps":["Recall the first idea: An electrical code sets requirements for installation safety; manufacturer instructions specify product limits. Cable selection depends on current, voltage drop, insulation, temperature, installation method and protection coordination.","Apply and check the contrasting idea: A grid-tied block diagram contains modules, DC protection/isolation, inverter, AC protection and the approved point of connection. Earthing and anti-islanding are essential design considerations.","Compare the methods in the two worked cases. State which information selects each method and check the result against the question."],"scene":"In Ile-Ife, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain electrical codes & regulations in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["A 12 V model losing 1 V in its cable loses 1/12 × 100 = 8.3% of source voltage, which signals an unsuitable illustrative design.","When a mock grid disappears, mark export as stopped; this represents anti-islanding, not a permission to test a real connection."],"question":"Why can two equal-current cables require different sizing?","options":["Cable colour alone changes current capacity","Current always determines size without other information","Their installation and thermal conditions differ"],"correct":2,"feedback":"The correct answer is: Their installation and thermal conditions differ. Match cable insulation and enclosures to the environment as well as the circuit voltage.","practice":"On paper, arrange these blocks: approved connection, PV modules, inverter. State what must happen to ordinary export when the utility fails.","solution":"Energy path: PV modules → inverter → approved connection. Ordinary export must stop through anti-islanding; continued backup requires a separately approved design and cannot be assumed.","mistake":"A common error is to ignore this distinction or condition: Two equal-current circuits in different thermal conditions may require different cable sizes; current alone cannot settle compliance.","limitations":["This is an authored recall set, not an official examination or evidence that every topic has been mastered."],"sources":["https://nerc.gov.ng/wp-content/uploads/2026/04/Mini-Grid-Regulations-2026.pdf","https://www.energy.gov/cmei/systems/solar-photovoltaic-system-design-basics"]},"text":"This is a worked recall session for Solar Photovoltaic Installation & Maintenance. Explain an idea without your notes, use it in an example, then check the method. The two cases below revisit selected concepts. Use the term topic list to plan wider revision.\n\nSTEP BY STEP\n\nRecall the first idea: An electrical code sets requirements for installation safety; manufacturer instructions specify product limits. Cable selection depends on current, voltage drop, insulation, temperature, installation method and protection coordination.\n\nApply and check the contrasting idea: A grid-tied block diagram contains modules, DC protection/isolation, inverter, AC protection and the approved point of connection. Earthing and anti-islanding are essential design considerations.\n\nCompare the methods in the two worked cases. State which information selects each method and check the result against the question.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Ile-Ife, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain electrical codes & regulations in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nA 12 V model losing 1 V in its cable loses 1/12 × 100 = 8.3% of source voltage, which signals an unsuitable illustrative design.\n\nEXAMPLE 2\n\nWhen a mock grid disappears, mark export as stopped; this represents anti-islanding, not a permission to test a real connection.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: Two equal-current circuits in different thermal conditions may require different cable sizes; current alone cannot settle compliance.\n\nPRACTICE\n\nOn paper, arrange these blocks: approved connection, PV modules, inverter. State what must happen to ordinary export when the utility fails."},{"id":"SS2-841","term":2,"week":"1","title":"Term 2 · Week 1 — Solar Water Pumping Systems","page":364,"focus":"Design, applications in agriculture","kind":"lesson","teaching":{"id":"SS2-841","intro":"A solar pumping system uses a PV supply, controller and suitable pump to move water. Required flow, total dynamic head, pipe losses and water availability determine design; storage tanks can buffer daytime pumping.","steps":["Estimate daily water demand first, then the available pumping window.","Distinguish vertical lift from total dynamic head, which also includes friction losses.","Match the required flow and head to a documented pump curve through a qualified design review."],"scene":"In Ilorin, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain solar water pumping systems in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["A garden needs 2,000 litres daily over 5 pumping hours: average delivery must be 400 litres per hour before allowances.","Lifting water to a higher tank increases head; the same pump may deliver less flow, so compare its curve rather than only its wattage."],"question":"What does total dynamic head include beyond vertical lift?","options":["Hydraulic losses along the water path","Only the tank's volume","Only the number of panels"],"correct":0,"feedback":"The correct answer is: Hydraulic losses along the water path. Estimate daily water demand first, then the available pumping window.","practice":"A farm needs 3,600 litres in a 6-hour pumping window. Calculate average required delivery and name a further pump-selection variable.","solution":"Delivery = 3,600/6 = 600 litres/hour before allowances. Total dynamic head, including lift and pipe losses, is also needed to match a pump curve.","mistake":"A common error is to ignore this distinction or condition: Lifting water to a higher tank increases head; the same pump may deliver less flow, so compare its curve rather than only its wattage.","sources":[],"limitations":[]},"text":"A solar pumping system uses a PV supply, controller and suitable pump to move water. Required flow, total dynamic head, pipe losses and water availability determine design; storage tanks can buffer daytime pumping.\n\nSTEP BY STEP\n\nEstimate daily water demand first, then the available pumping window.\n\nDistinguish vertical lift from total dynamic head, which also includes friction losses.\n\nMatch the required flow and head to a documented pump curve through a qualified design review.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Ilorin, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain solar water pumping systems in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nA garden needs 2,000 litres daily over 5 pumping hours: average delivery must be 400 litres per hour before allowances.\n\nEXAMPLE 2\n\nLifting water to a higher tank increases head; the same pump may deliver less flow, so compare its curve rather than only its wattage.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: Lifting water to a higher tank increases head; the same pump may deliver less flow, so compare its curve rather than only its wattage.\n\nPRACTICE\n\nA farm needs 3,600 litres in a 6-hour pumping window. Calculate average required delivery and name a further pump-selection variable."},{"id":"SS2-842","term":2,"week":"2","title":"Term 2 · Week 2 — Solar Street Lighting Systems","page":364,"focus":"Components, installation, maintenance","kind":"lesson","teaching":{"id":"SS2-842","intro":"A solar street light combines a module, charge controller, storage, luminaire and structural support. Lighting hours, night load, shading and battery condition affect service.","steps":["Calculate night energy from lamp wattage and operating hours before considering array size.","Mark daytime shading and access for safe maintenance on the site plan.","Include structural support, weather protection and a documented battery-maintenance arrangement in the design."],"scene":"In Ile-Ife, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain solar street lighting systems in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["A 30 W lamp used for 10 hours needs 300 Wh at the lamp; storage and generation allowances increase the required input.","A tree shading the module can reduce charging even when the lamp is healthy; investigate the energy path before replacing the luminaire."],"question":"A 20 W street lamp operates for 12 hours. What is its load energy?","options":["240 Wh","240 W","1.67 Wh"],"correct":0,"feedback":"Multiply the 20 W lamp power by 12 hours: 240 Wh. Dividing instead gives neither the required energy nor its units.","practice":"A streetlight originally runs 9 hours at 40 W. A revised schedule runs 6 hours at 40 W and 3 hours at 20 W. Find the energy saving.","solution":"Original = 40 × 9 = 360 Wh. Revised = 40 × 6 + 20 × 3 = 300 Wh. Saving = 60 Wh/night, without claiming an equivalent lighting standard.","mistake":"A common error is to ignore this distinction or condition: A tree shading the module can reduce charging even when the lamp is healthy; investigate the energy path before replacing the luminaire.","sources":[],"limitations":[]},"text":"A solar street light combines a module, charge controller, storage, luminaire and structural support. Lighting hours, night load, shading and battery condition affect service.\n\nSTEP BY STEP\n\nCalculate night energy from lamp wattage and operating hours before considering array size.\n\nMark daytime shading and access for safe maintenance on the site plan.\n\nInclude structural support, weather protection and a documented battery-maintenance arrangement in the design.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Ile-Ife, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain solar street lighting systems in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nA 30 W lamp used for 10 hours needs 300 Wh at the lamp; storage and generation allowances increase the required input.\n\nEXAMPLE 2\n\nA tree shading the module can reduce charging even when the lamp is healthy; investigate the energy path before replacing the luminaire.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: A tree shading the module can reduce charging even when the lamp is healthy; investigate the energy path before replacing the luminaire.\n\nPRACTICE\n\nA streetlight originally runs 9 hours at 40 W. A revised schedule runs 6 hours at 40 W and 3 hours at 20 W. Find the energy saving."},{"id":"SS2-843","term":2,"week":"3","title":"Term 2 · Week 3 — Solar Home Systems","page":364,"focus":"Standalone kits, plug-and-play designs","kind":"lesson","teaching":{"id":"SS2-843","intro":"A stand-alone home kit supplies defined loads without relying on the utility. Check DC or AC outputs, energy demand, connector compatibility, overload protection and the manufacturer's load limits.","steps":["Separate essential loads from optional loads and check each output's voltage and power limits.","Sum energy demands over a day rather than assuming all appliances run continuously.","Read the kit's actual supported connector and appliance list; never force incompatible plugs."],"scene":"In Lagos, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain solar home systems in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["Three 5 W lamps for 4 hours require 60 Wh. A 20 W radio for 2 hours adds 40 Wh, giving 100 Wh total load energy.","A kettle may exceed a small kit's instantaneous rating even if used briefly; a short operating time does not remove a power limit."],"question":"Why might a small home kit reject a briefly used kettle?","options":["All AC loads use the same power","The kettle exceeds instantaneous output capacity","A short duration always guarantees compatibility"],"correct":1,"feedback":"The correct answer is: The kettle exceeds instantaneous output capacity. Separate essential loads from optional loads and check each output's voltage and power limits.","practice":"A kit supplies four 6 W lamps for 5 hours and a 12 W radio for 3 hours. Calculate load energy and identify one separate compatibility check.","solution":"Lighting = 4 × 6 × 5 = 120 Wh. Radio = 12 × 3 = 36 Wh. Total = 156 Wh. Check output voltage/type and maximum supported power separately.","mistake":"A common error is to ignore this distinction or condition: A kettle may exceed a small kit's instantaneous rating even if used briefly; a short operating time does not remove a power limit.","sources":[],"limitations":[]},"text":"A stand-alone home kit supplies defined loads without relying on the utility. Check DC or AC outputs, energy demand, connector compatibility, overload protection and the manufacturer's load limits.\n\nSTEP BY STEP\n\nSeparate essential loads from optional loads and check each output's voltage and power limits.\n\nSum energy demands over a day rather than assuming all appliances run continuously.\n\nRead the kit's actual supported connector and appliance list; never force incompatible plugs.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Lagos, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain solar home systems in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nThree 5 W lamps for 4 hours require 60 Wh. A 20 W radio for 2 hours adds 40 Wh, giving 100 Wh total load energy.\n\nEXAMPLE 2\n\nA kettle may exceed a small kit's instantaneous rating even if used briefly; a short operating time does not remove a power limit.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: A kettle may exceed a small kit's instantaneous rating even if used briefly; a short operating time does not remove a power limit.\n\nPRACTICE\n\nA kit supplies four 6 W lamps for 5 hours and a 12 W radio for 3 hours. Calculate load energy and identify one separate compatibility check."},{"id":"SS2-844","term":2,"week":"4","title":"Term 2 · Week 4 — Advanced Wiring Techniques","page":364,"focus":"Conduits, trunking, cable protection","kind":"lesson","teaching":{"id":"SS2-844","intro":"Conduits and trunking protect and route cables; cable glands support suitable entries. Separation, bend radius, strain relief, enclosure rating and accessible identification help prevent damage.","steps":["Route model cables with supported runs, protected edges and accessible identification.","Distinguish mechanical protection from electrical insulation: neither replaces correct circuit protection.","Show changes of direction and entries on a drawing while respecting documented bend and enclosure requirements."],"scene":"In Ibadan, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain advanced wiring techniques in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["On a cardboard layout, route a cable away from a sharp metal edge and add a labelled protective sleeve at the entry.","An outdoor route needs components suitable for moisture and sunlight; indoor trunking cannot be assumed suitable because it fits."],"question":"What is the principal purpose of conduit or trunking?","options":["Replacing circuit overcurrent protection","Routing and mechanical protection of cables","Increasing stored battery energy"],"correct":1,"feedback":"The correct answer is: Routing and mechanical protection of cables. Route model cables with supported runs, protected edges and accessible identification.","practice":"A mock cable crosses a sharp opening and hangs unsupported. Recommend two changes and explain their purposes.","solution":"Add a suitable protective entry or sleeve to prevent abrasion at the edge, and support the run to prevent strain. Product suitability, bend limits and circuit protection still require design checks.","mistake":"A common error is to ignore this distinction or condition: An outdoor route needs components suitable for moisture and sunlight; indoor trunking cannot be assumed suitable because it fits.","sources":[],"limitations":[]},"text":"Conduits and trunking protect and route cables; cable glands support suitable entries. Separation, bend radius, strain relief, enclosure rating and accessible identification help prevent damage.\n\nSTEP BY STEP\n\nRoute model cables with supported runs, protected edges and accessible identification.\n\nDistinguish mechanical protection from electrical insulation: neither replaces correct circuit protection.\n\nShow changes of direction and entries on a drawing while respecting documented bend and enclosure requirements.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Ibadan, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain advanced wiring techniques in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nOn a cardboard layout, route a cable away from a sharp metal edge and add a labelled protective sleeve at the entry.\n\nEXAMPLE 2\n\nAn outdoor route needs components suitable for moisture and sunlight; indoor trunking cannot be assumed suitable because it fits.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: An outdoor route needs components suitable for moisture and sunlight; indoor trunking cannot be assumed suitable because it fits.\n\nPRACTICE\n\nA mock cable crosses a sharp opening and hangs unsupported. Recommend two changes and explain their purposes."},{"id":"SS2-845","term":2,"week":"5","title":"Term 2 · Week 5 — Midterm Test","page":364,"focus":"","kind":"assessment","text":"SCHEDULED SCHOOL SESSION\n\nMidterm Test\n\n\n\nThis scheme entry schedules an assessment, break or closing session. It is not a new teaching topic. Your school sets its assessment arrangements. Use the earlier worked lessons to practise and explain corrections."},{"id":"SS2-846","term":2,"week":"6","title":"Term 2 · Week 6 — PV System Maintenance I","page":364,"focus":"Preventive maintenance – cleaning panels, checking terminals","kind":"lesson","teaching":{"id":"SS2-846","intro":"Preventive maintenance follows a planned schedule before a failure. A competent installer checks safe access, visual condition, shading, output records and manufacturer-approved cleaning needs.","steps":["Create a baseline with dated output and visual-condition records so later changes have context.","Classify cleaning, vegetation review and professional terminal inspection as different maintenance tasks.","Schedule work around safe access and manufacturer instructions rather than touching modules in active service."],"scene":"In Ile-Ife, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain pv system maintenance i in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["A monthly log shows new tree shading and falling daily energy; record both and ask a competent maintainer to assess the obstruction.","A loose-looking terminal is photographed from a safe distance and reported; a learner must not tighten an energised connection."],"question":"Which task is preventive maintenance?","options":["Resetting a protective trip repeatedly","Scheduled condition review before a failure","Replacing parts only after every breakdown"],"correct":1,"feedback":"The correct answer is: Scheduled condition review before a failure. Create a baseline with dated output and visual-condition records so later changes have context.","practice":"Three monthly simulated outputs are 90, 89 and 63 kWh; a new awning appeared in month three. State a reasonable investigation and a limit.","solution":"Investigate whether the awning introduced shading, comparing records and safe visual observations. The correlation suggests a hypothesis, but weather, operating time and other conditions must be checked before assigning the cause.","mistake":"A common error is to ignore this distinction or condition: A loose-looking terminal is photographed from a safe distance and reported; a learner must not tighten an energised connection.","sources":[],"limitations":[]},"text":"Preventive maintenance follows a planned schedule before a failure. A competent installer checks safe access, visual condition, shading, output records and manufacturer-approved cleaning needs.\n\nSTEP BY STEP\n\nCreate a baseline with dated output and visual-condition records so later changes have context.\n\nClassify cleaning, vegetation review and professional terminal inspection as different maintenance tasks.\n\nSchedule work around safe access and manufacturer instructions rather than touching modules in active service.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Ile-Ife, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain pv system maintenance i in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nA monthly log shows new tree shading and falling daily energy; record both and ask a competent maintainer to assess the obstruction.\n\nEXAMPLE 2\n\nA loose-looking terminal is photographed from a safe distance and reported; a learner must not tighten an energised connection.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: A loose-looking terminal is photographed from a safe distance and reported; a learner must not tighten an energised connection.\n\nPRACTICE\n\nThree monthly simulated outputs are 90, 89 and 63 kWh; a new awning appeared in month three. State a reasonable investigation and a limit."},{"id":"SS2-847","term":2,"week":"7","title":"Term 2 · Week 7 — Midterm Break","page":364,"focus":"","kind":"assessment","text":"SCHEDULED SCHOOL SESSION\n\nMidterm Break\n\n\n\nThis scheme entry schedules an assessment, break or closing session. It is not a new teaching topic. Your school sets its assessment arrangements. Use the earlier worked lessons to practise and explain corrections."},{"id":"SS2-848","term":2,"week":"8","title":"Term 2 · Week 8 — PV System Maintenance II","page":364,"focus":"Troubleshooting faults, replacing components","kind":"lesson","teaching":{"id":"SS2-848","intro":"Corrective maintenance identifies a fault before replacing a component. Separate a symptom from a cause and use records, alarms and safe professional tests to narrow the fault.","steps":["Use a fault tree to separate no generation, low generation and interrupted load supply.","Compare the affected branch with unaffected branches and record relevant weather or alarm history.","Replace a part only after competent diagnosis establishes compatibility and the underlying cause."],"scene":"In Ibadan, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain pv system maintenance ii in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["If only one branch has low output while others are normal, inspect that branch's records and visible shading before blaming the whole inverter.","A repeated protective trip is a reason to stop and escalate, not to bypass the protective device to restore service."],"question":"A protective device trips repeatedly. What should happen?","options":["Bypass it to maintain supply","Fit a larger device without checking the circuit","Stop and obtain competent fault investigation"],"correct":2,"feedback":"The correct answer is: Stop and obtain competent fault investigation. Use a fault tree to separate no generation, low generation and interrupted load supply.","practice":"A mock system has normal PV output but no load supply and an inverter alarm. Which subsystem should be investigated first, and what should not be inferred?","solution":"Start with the inverter/output-path alarm and relevant records, using qualified diagnosis. Normal array output does not prove the whole system is healthy, and the alarm alone does not identify a replacement part.","mistake":"A common error is to ignore this distinction or condition: A repeated protective trip is a reason to stop and escalate, not to bypass the protective device to restore service.","sources":[],"limitations":[]},"text":"Corrective maintenance identifies a fault before replacing a component. Separate a symptom from a cause and use records, alarms and safe professional tests to narrow the fault.\n\nSTEP BY STEP\n\nUse a fault tree to separate no generation, low generation and interrupted load supply.\n\nCompare the affected branch with unaffected branches and record relevant weather or alarm history.\n\nReplace a part only after competent diagnosis establishes compatibility and the underlying cause.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Ibadan, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain pv system maintenance ii in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nIf only one branch has low output while others are normal, inspect that branch's records and visible shading before blaming the whole inverter.\n\nEXAMPLE 2\n\nA repeated protective trip is a reason to stop and escalate, not to bypass the protective device to restore service.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: A repeated protective trip is a reason to stop and escalate, not to bypass the protective device to restore service.\n\nPRACTICE\n\nA mock system has normal PV output but no load supply and an inverter alarm. Which subsystem should be investigated first, and what should not be inferred?"},{"id":"SS2-849","term":2,"week":"9","title":"Term 2 · Week 9 — Monitoring & Performance Evaluation","page":364,"focus":"Using meters and software for performance","kind":"lesson","teaching":{"id":"SS2-849","intro":"Performance monitoring compares energy, power, availability and environmental conditions over time. A useful baseline accounts for changing sunlight, temperature, shading and operating hours.","steps":["Distinguish instantaneous power from accumulated energy and display the correct units.","Compare like periods while noting weather, load restrictions and equipment downtime.","Treat implausible readings as possible measurement or communication faults before declaring system failure."],"scene":"In Ilorin, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain monitoring & performance evaluation in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["Yesterday's 4 kWh and today's 2 kWh do not prove failure if today was heavily overcast; add weather observations.","A meter showing 500 W for 2 hours corresponds to 1 kWh only if that power remained constant during the interval."],"question":"Which comparison gives the fairest first performance assessment?","options":["Only the highest reading from each month","Energy over similar periods with weather context","One noon reading against another day's total"],"correct":1,"feedback":"The correct answer is: Energy over similar periods with weather context. Distinguish instantaneous power from accumulated energy and display the correct units.","practice":"A simulated constant output is 750 W for 3 hours. Calculate energy and explain why a single 750 W reading cannot prove that total.","solution":"Energy = 750 × 3 = 2,250 Wh = 2.25 kWh. A single reading is instantaneous; power must remain at that level throughout the interval for this calculation to apply.","mistake":"A common error is to ignore this distinction or condition: A meter showing 500 W for 2 hours corresponds to 1 kWh only if that power remained constant during the interval.","sources":[],"limitations":[]},"text":"Performance monitoring compares energy, power, availability and environmental conditions over time. A useful baseline accounts for changing sunlight, temperature, shading and operating hours.\n\nSTEP BY STEP\n\nDistinguish instantaneous power from accumulated energy and display the correct units.\n\nCompare like periods while noting weather, load restrictions and equipment downtime.\n\nTreat implausible readings as possible measurement or communication faults before declaring system failure.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Ilorin, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain monitoring & performance evaluation in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nYesterday's 4 kWh and today's 2 kWh do not prove failure if today was heavily overcast; add weather observations.\n\nEXAMPLE 2\n\nA meter showing 500 W for 2 hours corresponds to 1 kWh only if that power remained constant during the interval.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: A meter showing 500 W for 2 hours corresponds to 1 kWh only if that power remained constant during the interval.\n\nPRACTICE\n\nA simulated constant output is 750 W for 3 hours. Calculate energy and explain why a single 750 W reading cannot prove that total."},{"id":"SS2-850","term":2,"week":"10","title":"Term 2 · Week 10 — Practical: Maintenance of Installed Systems","page":364,"focus":"Cleaning, testing, fault-finding","kind":"lesson","teaching":{"id":"SS2-850","intro":"A maintenance demonstration should begin with records and an isolation plan prepared by a qualified person. Learners use photographs, labelled dummy terminals and simulated readings rather than live equipment.","steps":["Prepare a simulated inspection sheet with component identity, observation, significance and referral action.","Separate observations made safely from tests that require isolation and a competent technician.","Compare before-and-after records under stated conditions before writing that maintenance restored performance."],"scene":"In Ile-Ife, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain practical: maintenance of installed systems in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["A mock log lists dust, no new shade and reduced output: propose inspection and manufacturer-approved cleaning by a competent person.","If simulated output remains low after the cleaning case, continue diagnosis; cleaning is a hypothesis, not proof of a repaired system."],"question":"What makes a maintenance conclusion stronger?","options":["Replacing the most expensive component first","Before-and-after evidence under stated conditions","A clean-looking panel alone"],"correct":1,"feedback":"The correct answer is: Before-and-after evidence under stated conditions. Prepare a simulated inspection sheet with component identity, observation, significance and referral action.","practice":"After mock maintenance, output rises from 300 to 450 W, but sunlight also increases. Can the class attribute the whole increase to maintenance?","solution":"No. Both maintenance and changing sunlight could affect output. Record the confounding change and seek comparable-condition measurements before estimating the maintenance effect.","mistake":"A common error is to ignore this distinction or condition: If simulated output remains low after the cleaning case, continue diagnosis; cleaning is a hypothesis, not proof of a repaired system.","sources":[],"limitations":[]},"text":"A maintenance demonstration should begin with records and an isolation plan prepared by a qualified person. Learners use photographs, labelled dummy terminals and simulated readings rather than live equipment.\n\nSTEP BY STEP\n\nPrepare a simulated inspection sheet with component identity, observation, significance and referral action.\n\nSeparate observations made safely from tests that require isolation and a competent technician.\n\nCompare before-and-after records under stated conditions before writing that maintenance restored performance.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Ile-Ife, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain practical: maintenance of installed systems in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nA mock log lists dust, no new shade and reduced output: propose inspection and manufacturer-approved cleaning by a competent person.\n\nEXAMPLE 2\n\nIf simulated output remains low after the cleaning case, continue diagnosis; cleaning is a hypothesis, not proof of a repaired system.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: If simulated output remains low after the cleaning case, continue diagnosis; cleaning is a hypothesis, not proof of a repaired system.\n\nPRACTICE\n\nAfter mock maintenance, output rises from 300 to 450 W, but sunlight also increases. Can the class attribute the whole increase to maintenance?"},{"id":"SS2-851","term":2,"week":"11–13","title":"Term 2 · Week 11–13 — Revision & Exams","page":364,"focus":"","kind":"revision","teaching":{"id":"SS2-851","intro":"This is a worked recall session for Solar Photovoltaic Installation & Maintenance. Explain an idea without your notes, use it in an example, then check the method. The two cases below revisit selected concepts. Use the term topic list to plan wider revision.","steps":["Recall the first idea: Performance monitoring compares energy, power, availability and environmental conditions over time. A useful baseline accounts for changing sunlight, temperature, shading and operating hours.","Apply and check the contrasting idea: A maintenance demonstration should begin with records and an isolation plan prepared by a qualified person. Learners use photographs, labelled dummy terminals and simulated readings rather than live equipment.","Compare the methods in the two worked cases. State which information selects each method and check the result against the question."],"scene":"In Ilorin, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain monitoring & performance evaluation in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["Yesterday's 4 kWh and today's 2 kWh do not prove failure if today was heavily overcast; add weather observations.","If simulated output remains low after the cleaning case, continue diagnosis; cleaning is a hypothesis, not proof of a repaired system."],"question":"Which comparison gives the fairest first performance assessment?","options":["Only the highest reading from each month","Energy over similar periods with weather context","One noon reading against another day's total"],"correct":1,"feedback":"The correct answer is: Energy over similar periods with weather context. Distinguish instantaneous power from accumulated energy and display the correct units.","practice":"After mock maintenance, output rises from 300 to 450 W, but sunlight also increases. Can the class attribute the whole increase to maintenance?","solution":"No. Both maintenance and changing sunlight could affect output. Record the confounding change and seek comparable-condition measurements before estimating the maintenance effect.","mistake":"A common error is to ignore this distinction or condition: A meter showing 500 W for 2 hours corresponds to 1 kWh only if that power remained constant during the interval.","limitations":["This is an authored recall set, not an official examination or evidence that every topic has been mastered."],"sources":[]},"text":"This is a worked recall session for Solar Photovoltaic Installation & Maintenance. Explain an idea without your notes, use it in an example, then check the method. The two cases below revisit selected concepts. Use the term topic list to plan wider revision.\n\nSTEP BY STEP\n\nRecall the first idea: Performance monitoring compares energy, power, availability and environmental conditions over time. A useful baseline accounts for changing sunlight, temperature, shading and operating hours.\n\nApply and check the contrasting idea: A maintenance demonstration should begin with records and an isolation plan prepared by a qualified person. Learners use photographs, labelled dummy terminals and simulated readings rather than live equipment.\n\nCompare the methods in the two worked cases. State which information selects each method and check the result against the question.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Ilorin, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain monitoring & performance evaluation in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nYesterday's 4 kWh and today's 2 kWh do not prove failure if today was heavily overcast; add weather observations.\n\nEXAMPLE 2\n\nIf simulated output remains low after the cleaning case, continue diagnosis; cleaning is a hypothesis, not proof of a repaired system.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: A meter showing 500 W for 2 hours corresponds to 1 kWh only if that power remained constant during the interval.\n\nPRACTICE\n\nAfter mock maintenance, output rises from 300 to 450 W, but sunlight also increases. Can the class attribute the whole increase to maintenance?"},{"id":"SS2-852","term":3,"week":"1","title":"Term 3 · Week 1 — Introduction to Solar Entrepreneurship","page":365,"focus":"Opportunities in Nigeria","kind":"lesson","teaching":{"id":"SS2-852","intro":"Solar enterprises can provide load surveys, sales, competent installation, monitoring and maintenance. A viable opportunity solves a defined customer problem with realistic costs and after-sales responsibility.","steps":["Identify a specific customer group and the problem that group is willing to pay to solve.","List the skills, tools, suppliers and after-sales capacity needed to deliver the service.","Estimate both income and recurring obligations before describing an opportunity as profitable."],"scene":"In Ibadan, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain introduction to solar entrepreneurship in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["A barber needs evening lighting: record lamp loads and hours before offering a package, because a customer's appliance list determines demand.","A business offering annual inspections must budget travel and staff time; selling a service creates continuing obligations."],"question":"Which is a service opportunity beyond selling panels?","options":["Promising unlimited electricity","Selling equipment without support obligations","Paid monitoring and maintenance"],"correct":2,"feedback":"The correct answer is: Paid monitoring and maintenance. Identify a specific customer group and the problem that group is willing to pay to solve.","practice":"A monitoring service receives ₦60,000 monthly but spends ₦18,000 on travel and ₦25,000 on labour and communications. Calculate surplus before other costs.","solution":"Surplus = 60,000 − 18,000 − 25,000 = ₦17,000. Rent, equipment, tax where applicable and other omitted costs could reduce net profit.","mistake":"A common error is to ignore this distinction or condition: A business offering annual inspections must budget travel and staff time; selling a service creates continuing obligations.","sources":[],"limitations":[]},"text":"Solar enterprises can provide load surveys, sales, competent installation, monitoring and maintenance. A viable opportunity solves a defined customer problem with realistic costs and after-sales responsibility.\n\nSTEP BY STEP\n\nIdentify a specific customer group and the problem that group is willing to pay to solve.\n\nList the skills, tools, suppliers and after-sales capacity needed to deliver the service.\n\nEstimate both income and recurring obligations before describing an opportunity as profitable.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Ibadan, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain introduction to solar entrepreneurship in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nA barber needs evening lighting: record lamp loads and hours before offering a package, because a customer's appliance list determines demand.\n\nEXAMPLE 2\n\nA business offering annual inspections must budget travel and staff time; selling a service creates continuing obligations.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: A business offering annual inspections must budget travel and staff time; selling a service creates continuing obligations.\n\nPRACTICE\n\nA monitoring service receives ₦60,000 monthly but spends ₦18,000 on travel and ₦25,000 on labour and communications. Calculate surplus before other costs."},{"id":"SS2-853","term":3,"week":"2","title":"Term 3 · Week 2 — Business Skills in Solar Sector","page":365,"focus":"Proposal writing, tendering","kind":"lesson","teaching":{"id":"SS2-853","intro":"A proposal describes the customer's need, scope, design assumptions, exclusions, price, timetable and support. Tendering requires responding to the stated evaluation criteria with verifiable evidence.","steps":["Translate the customer's request into measurable deliverables and a clear boundary of work.","Present assumptions, exclusions and acceptance criteria so the customer can review the offer.","Check the tender's submission evidence and deadlines without inventing credentials or approvals."],"scene":"In Ilorin, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain business skills in solar sector in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["A proposal that specifies lighting hours and assumed demand is easier to assess than one promising unlimited power.","If a tender asks for warranty terms, state duration, responsible supplier and conditions rather than writing only 'full warranty'."],"question":"What belongs in a reviewable solar proposal?","options":["Only a total price","Scope, assumptions and acceptance criteria","An unlimited-power promise"],"correct":1,"feedback":"The correct answer is: Scope, assumptions and acceptance criteria. Translate the customer's request into measurable deliverables and a clear boundary of work.","practice":"A client's request says 'power my shop' but gives no appliance list. Name three details needed before quoting a defensible design.","solution":"Obtain appliance power ratings, operating hours and simultaneous-use pattern. Also clarify essential loads and site conditions. These distinguish energy needs from peak power and prevent an unsupported package promise.","mistake":"A common error is to ignore this distinction or condition: If a tender asks for warranty terms, state duration, responsible supplier and conditions rather than writing only 'full warranty'.","sources":[],"limitations":[]},"text":"A proposal describes the customer's need, scope, design assumptions, exclusions, price, timetable and support. Tendering requires responding to the stated evaluation criteria with verifiable evidence.\n\nSTEP BY STEP\n\nTranslate the customer's request into measurable deliverables and a clear boundary of work.\n\nPresent assumptions, exclusions and acceptance criteria so the customer can review the offer.\n\nCheck the tender's submission evidence and deadlines without inventing credentials or approvals.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Ilorin, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain business skills in solar sector in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nA proposal that specifies lighting hours and assumed demand is easier to assess than one promising unlimited power.\n\nEXAMPLE 2\n\nIf a tender asks for warranty terms, state duration, responsible supplier and conditions rather than writing only 'full warranty'.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: If a tender asks for warranty terms, state duration, responsible supplier and conditions rather than writing only 'full warranty'.\n\nPRACTICE\n\nA client's request says 'power my shop' but gives no appliance list. Name three details needed before quoting a defensible design."},{"id":"SS2-854","term":3,"week":"3","title":"Term 3 · Week 3 — Costing & Pricing of Solar Systems","page":365,"focus":"Bill of quantities, cost analysis","kind":"lesson","teaching":{"id":"SS2-854","intro":"A bill of quantities lists items, quantities, units, unit prices and amounts. Distinguish equipment, labour, transport, contingency, tax where applicable and profit margin.","steps":["Multiply quantity by unit rate for every line, preserving units and currency.","Keep labour, transport and overhead visible so the equipment subtotal is not mistaken for total cost.","Calculate markup and margin using their different denominators, then state which measure is used."],"scene":"In Ile-Ife, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain costing & pricing of solar systems in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["Four mounting items at ₦5,000 cost ₦20,000; adding ₦8,000 labour gives ₦28,000 before other costs.","With cost ₦100,000 and selling price ₦125,000, profit is ₦25,000; markup is 25% of cost and margin is 20% of sales."],"question":"A system costs ₦80,000 and sells for ₦100,000. What is sales margin?","options":["80%","20%","25%"],"correct":1,"feedback":"Profit is ₦20,000. Sales margin uses selling price as denominator: 20,000/100,000 ×100 =20%. The 25% figure is markup on cost.","practice":"A quote includes 3 items at ₦12,000, labour ₦9,000 and transport ₦5,000. Find cost and selling price for a 20% markup on cost.","solution":"Item cost = ₦36,000; total cost = 36,000 + 9,000 + 5,000 = ₦50,000. Markup = ₦10,000, giving price ₦60,000 before omitted charges.","mistake":"A common error is to ignore this distinction or condition: With cost ₦100,000 and selling price ₦125,000, profit is ₦25,000; markup is 25% of cost and margin is 20% of sales.","sources":[],"limitations":[]},"text":"A bill of quantities lists items, quantities, units, unit prices and amounts. Distinguish equipment, labour, transport, contingency, tax where applicable and profit margin.\n\nSTEP BY STEP\n\nMultiply quantity by unit rate for every line, preserving units and currency.\n\nKeep labour, transport and overhead visible so the equipment subtotal is not mistaken for total cost.\n\nCalculate markup and margin using their different denominators, then state which measure is used.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Ile-Ife, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain costing & pricing of solar systems in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nFour mounting items at ₦5,000 cost ₦20,000; adding ₦8,000 labour gives ₦28,000 before other costs.\n\nEXAMPLE 2\n\nWith cost ₦100,000 and selling price ₦125,000, profit is ₦25,000; markup is 25% of cost and margin is 20% of sales.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: With cost ₦100,000 and selling price ₦125,000, profit is ₦25,000; markup is 25% of cost and margin is 20% of sales.\n\nPRACTICE\n\nA quote includes 3 items at ₦12,000, labour ₦9,000 and transport ₦5,000. Find cost and selling price for a 20% markup on cost."},{"id":"SS2-855","term":3,"week":"4","title":"Term 3 · Week 4 — Customer Service & Support","page":365,"focus":"Handling clients, after-sales service","kind":"lesson","teaching":{"id":"SS2-855","intro":"Customer support begins with listening, accurate fault records, clear operating guidance and realistic response times. Explain system limits and distinguish warranty responsibilities from chargeable work.","steps":["Record the customer's symptoms using their words before translating them into a technical job description.","Explain permitted loads, operating limits and contact arrangements using clear everyday language.","Track the complaint through acknowledgement, authorised diagnosis, resolution and follow-up evidence."],"scene":"In Lagos, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain customer service & support in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["A customer reports 'no light': ask when it began, which loads are affected and what indicators show before assuming battery failure.","If a repair date changes, give the new estimate and reason promptly; silence damages trust even when a fault is technically difficult."],"question":"What is the best first response to an unclear customer fault report?","options":["Record affected loads, timing and indicators","Promise a battery replacement immediately","Tell the customer every outage is normal"],"correct":0,"feedback":"The correct answer is: Record affected loads, timing and indicators. Record the customer's symptoms using their words before translating them into a technical job description.","practice":"A customer reports lights working but a socket appliance failing. Draft the next diagnostic questions without asking for hazardous tests.","solution":"Ask which appliance, whether other authorised socket loads are affected, when the fault began and what indicators show. Ask about recent changes. Do not ask the customer to open equipment or bypass protection.","mistake":"A common error is to ignore this distinction or condition: If a repair date changes, give the new estimate and reason promptly; silence damages trust even when a fault is technically difficult.","sources":[],"limitations":[]},"text":"Customer support begins with listening, accurate fault records, clear operating guidance and realistic response times. Explain system limits and distinguish warranty responsibilities from chargeable work.\n\nSTEP BY STEP\n\nRecord the customer's symptoms using their words before translating them into a technical job description.\n\nExplain permitted loads, operating limits and contact arrangements using clear everyday language.\n\nTrack the complaint through acknowledgement, authorised diagnosis, resolution and follow-up evidence.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Lagos, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain customer service & support in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nA customer reports 'no light': ask when it began, which loads are affected and what indicators show before assuming battery failure.\n\nEXAMPLE 2\n\nIf a repair date changes, give the new estimate and reason promptly; silence damages trust even when a fault is technically difficult.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: If a repair date changes, give the new estimate and reason promptly; silence damages trust even when a fault is technically difficult.\n\nPRACTICE\n\nA customer reports lights working but a socket appliance failing. Draft the next diagnostic questions without asking for hazardous tests."},{"id":"SS2-856","term":3,"week":"5","title":"Term 3 · Week 5 — Midterm Test","page":365,"focus":"","kind":"assessment","text":"SCHEDULED SCHOOL SESSION\n\nMidterm Test\n\n\n\nThis scheme entry schedules an assessment, break or closing session. It is not a new teaching topic. Your school sets its assessment arrangements. Use the earlier worked lessons to practise and explain corrections."},{"id":"SS2-857","term":3,"week":"6","title":"Term 3 · Week 6 — Project Management in Solar Installations","page":365,"focus":"Time, resources, quality control","kind":"lesson","teaching":{"id":"SS2-857","intro":"A project plan coordinates scope, tasks, people, materials, time and acceptance checks. Dependencies show which tasks must finish before others can begin.","steps":["Break the installation into tasks with owners and dependencies, not just a final date.","Allocate materials and competent staff before committing to a timetable.","Use documented acceptance checks and handover records to confirm scope, quality and customer instruction."],"scene":"In Ilorin, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain project management in solar installations in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["If mounting approval must precede installation, a delayed approval moves the installation date; adding installers cannot remove that dependency.","A checklist with equipment serial numbers and handover signatures helps confirm delivery and trace later faults."],"question":"Which item is a project dependency?","options":["Mounting approval before installation","The colour of the report cover","The number of sales enquiries"],"correct":0,"feedback":"The correct answer is: Mounting approval before installation. Break the installation into tasks with owners and dependencies, not just a final date.","practice":"A project needs 2 days for survey, then 3 days for design, then 2 days for review. What is the shortest sequential duration, and what happens if review takes one extra day?","solution":"Minimum = 2 + 3 + 2 = 7 days. If review takes 3 days, completion becomes 8 days unless another justified plan change removes a delay.","mistake":"A common error is to ignore this distinction or condition: A checklist with equipment serial numbers and handover signatures helps confirm delivery and trace later faults.","sources":[],"limitations":[]},"text":"A project plan coordinates scope, tasks, people, materials, time and acceptance checks. Dependencies show which tasks must finish before others can begin.\n\nSTEP BY STEP\n\nBreak the installation into tasks with owners and dependencies, not just a final date.\n\nAllocate materials and competent staff before committing to a timetable.\n\nUse documented acceptance checks and handover records to confirm scope, quality and customer instruction.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Ilorin, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain project management in solar installations in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nIf mounting approval must precede installation, a delayed approval moves the installation date; adding installers cannot remove that dependency.\n\nEXAMPLE 2\n\nA checklist with equipment serial numbers and handover signatures helps confirm delivery and trace later faults.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: A checklist with equipment serial numbers and handover signatures helps confirm delivery and trace later faults.\n\nPRACTICE\n\nA project needs 2 days for survey, then 3 days for design, then 2 days for review. What is the shortest sequential duration, and what happens if review takes one extra day?"},{"id":"SS2-858","term":3,"week":"7","title":"Term 3 · Week 7 — Midterm Break","page":365,"focus":"","kind":"assessment","text":"SCHEDULED SCHOOL SESSION\n\nMidterm Break\n\n\n\nThis scheme entry schedules an assessment, break or closing session. It is not a new teaching topic. Your school sets its assessment arrangements. Use the earlier worked lessons to practise and explain corrections."},{"id":"SS2-859","term":3,"week":"8","title":"Term 3 · Week 8 — Case Studies of Nigerian Solar Projects","page":365,"focus":"Rural electrification, mini-grids","kind":"lesson","teaching":{"id":"SS2-859","intro":"A solar case study examines the problem, ownership model, technical arrangement, finance, maintenance and measured outcomes. A mini-grid serves multiple customers through a local distribution network.","steps":["Describe the project boundary, users, energy sources and operator before judging success.","Compare outcomes with the original objective using measured service and cost data.","State whether evidence is observed, reported or hypothetical so the case study remains honest."],"scene":"In Lagos, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain case studies of nigerian solar projects in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["For a hypothetical village mini-grid, count connected shops and actual service hours separately; connection alone does not prove reliable supply.","Compare two projects using energy delivered per month and downtime, while noting differences in weather, customer demand and reporting periods."],"question":"What distinguishes a mini-grid from one household kit?","options":["A local network serving multiple customers","The presence of any one solar module","A guaranteed continuous supply"],"correct":0,"feedback":"The correct answer is: A local network serving multiple customers. Describe the project boundary, users, energy sources and operator before judging success.","practice":"Project A serves 20 shops for 8 hours/day; project B serves 30 shops for 5 hours/day. Compare shop-hours and state a limitation.","solution":"A supplies 160 shop-hours/day; B supplies 150. This measure does not establish energy, service quality or equal shop demand, so it cannot alone rank project success.","mistake":"A common error is to ignore this distinction or condition: Compare two projects using energy delivered per month and downtime, while noting differences in weather, customer demand and reporting periods.","sources":["https://nerc.gov.ng/wp-content/uploads/2026/04/Mini-Grid-Regulations-2026.pdf"],"limitations":["Requirements depend on current jurisdiction, installation and authority. The 2025 scheme is a topic outline, not a compliance manual; no connection approval or regulatory eligibility is asserted."]},"text":"A solar case study examines the problem, ownership model, technical arrangement, finance, maintenance and measured outcomes. A mini-grid serves multiple customers through a local distribution network.\n\nSTEP BY STEP\n\nDescribe the project boundary, users, energy sources and operator before judging success.\n\nCompare outcomes with the original objective using measured service and cost data.\n\nState whether evidence is observed, reported or hypothetical so the case study remains honest.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Lagos, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain case studies of nigerian solar projects in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nFor a hypothetical village mini-grid, count connected shops and actual service hours separately; connection alone does not prove reliable supply.\n\nEXAMPLE 2\n\nCompare two projects using energy delivered per month and downtime, while noting differences in weather, customer demand and reporting periods.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: Compare two projects using energy delivered per month and downtime, while noting differences in weather, customer demand and reporting periods.\n\nPRACTICE\n\nProject A serves 20 shops for 8 hours/day; project B serves 30 shops for 5 hours/day. Compare shop-hours and state a limitation."},{"id":"SS2-860","term":3,"week":"9","title":"Term 3 · Week 9 — Practical: Business Simulation","page":365,"focus":"Preparing a proposal for a 5kVA solar system","kind":"lesson","teaching":{"id":"SS2-860","intro":"A 5 kVA proposal describes apparent-power capacity, not daily energy supply. Real power depends on power factor and allowable loading; batteries and PV require a separate energy assessment.","steps":["List simultaneous appliance demand separately from daily energy requirements.","Build a bill of quantities whose quantities follow the load assessment and proposed arrangement.","State exclusions, battery assumptions, site requirements and professional verification needed before installation."],"scene":"In Ibadan, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain practical: business simulation in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["At an assumed power factor of 0.8, 5 kVA corresponds to 4 kW; this is a teaching calculation, not a universal operating allowance.","A 1 kW load for 6 hours needs 6 kWh at the load. The 5 kVA label alone cannot specify required battery capacity."],"question":"At power factor 0.9, what real power corresponds to 5 kVA in a simplified calculation?","options":["5.9 kW","5 kWh","4.5 kW"],"correct":2,"feedback":"Real power = apparent power × power factor: 5 kVA ×0.9 =4.5 kW. kWh would describe energy over time.","practice":"A proposed system serves a 600 W load for 7 hours daily. Calculate load energy and explain why a 5 kVA label does not specify storage.","solution":"Energy = 600 × 7 = 4,200 Wh = 4.2 kWh. kVA describes apparent-power capacity; storage needs usable energy, losses and operating assumptions assessed separately.","mistake":"A common error is to ignore this distinction or condition: A 1 kW load for 6 hours needs 6 kWh at the load. The 5 kVA label alone cannot specify required battery capacity.","sources":[],"limitations":[]},"text":"A 5 kVA proposal describes apparent-power capacity, not daily energy supply. Real power depends on power factor and allowable loading; batteries and PV require a separate energy assessment.\n\nSTEP BY STEP\n\nList simultaneous appliance demand separately from daily energy requirements.\n\nBuild a bill of quantities whose quantities follow the load assessment and proposed arrangement.\n\nState exclusions, battery assumptions, site requirements and professional verification needed before installation.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Ibadan, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain practical: business simulation in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nAt an assumed power factor of 0.8, 5 kVA corresponds to 4 kW; this is a teaching calculation, not a universal operating allowance.\n\nEXAMPLE 2\n\nA 1 kW load for 6 hours needs 6 kWh at the load. The 5 kVA label alone cannot specify required battery capacity.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: A 1 kW load for 6 hours needs 6 kWh at the load. The 5 kVA label alone cannot specify required battery capacity.\n\nPRACTICE\n\nA proposed system serves a 600 W load for 7 hours daily. Calculate load energy and explain why a 5 kVA label does not specify storage."},{"id":"SS2-861","term":3,"week":"10","title":"Term 3 · Week 10 — Field Visit","page":365,"focus":"Visit to a solar company/installation site","kind":"lesson","teaching":{"id":"SS2-861","intro":"A field visit is structured evidence gathering, with permission, site rules and prepared questions. Record component roles, hazard controls, maintenance records and customer needs without touching equipment.","steps":["Prepare questions about component roles, maintenance and customer service before visiting.","Follow the host's visitor route and take only permitted notes or photographs.","Turn observations into a report that separates what was seen from what was inferred."],"scene":"In Ilorin, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain field visit in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["Ask why an inverter location was chosen: ventilation, access and manufacturer clearances offer more useful evidence than its colour.","A visitor sees a warning sign and stays outside the barrier; photographs and questions can document the lesson without entering a live work area."],"question":"Which observation is most useful on a solar field visit?","options":["A visitor's guess at hidden wiring","How equipment roles and maintenance records relate","Only the paint colour of enclosures"],"correct":1,"feedback":"The correct answer is: How equipment roles and maintenance records relate. Prepare questions about component roles, maintenance and customer service before visiting.","practice":"Write three questions for a host about an installation's reliability, avoiding access to live equipment.","solution":"Ask what loads and hours the system is designed for, what maintenance is recorded, and how downtime or alarms are tracked. The answers connect service expectations, preventive work and measured performance.","mistake":"A common error is to ignore this distinction or condition: A visitor sees a warning sign and stays outside the barrier; photographs and questions can document the lesson without entering a live work area.","sources":[],"limitations":[]},"text":"A field visit is structured evidence gathering, with permission, site rules and prepared questions. Record component roles, hazard controls, maintenance records and customer needs without touching equipment.\n\nSTEP BY STEP\n\nPrepare questions about component roles, maintenance and customer service before visiting.\n\nFollow the host's visitor route and take only permitted notes or photographs.\n\nTurn observations into a report that separates what was seen from what was inferred.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Ilorin, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain field visit in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nAsk why an inverter location was chosen: ventilation, access and manufacturer clearances offer more useful evidence than its colour.\n\nEXAMPLE 2\n\nA visitor sees a warning sign and stays outside the barrier; photographs and questions can document the lesson without entering a live work area.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: A visitor sees a warning sign and stays outside the barrier; photographs and questions can document the lesson without entering a live work area.\n\nPRACTICE\n\nWrite three questions for a host about an installation's reliability, avoiding access to live equipment."},{"id":"SS2-862","term":3,"week":"11–13","title":"Term 3 · Week 11–13 — Revision & Exams","page":365,"focus":"","kind":"revision","teaching":{"id":"SS2-862","intro":"This is a worked recall session for Solar Photovoltaic Installation & Maintenance. Explain an idea without your notes, use it in an example, then check the method. The two cases below revisit selected concepts. Use the term topic list to plan wider revision.","steps":["Recall the first idea: A 5 kVA proposal describes apparent-power capacity, not daily energy supply. Real power depends on power factor and allowable loading; batteries and PV require a separate energy assessment.","Apply and check the contrasting idea: A field visit is structured evidence gathering, with permission, site rules and prepared questions. Record component roles, hazard controls, maintenance records and customer needs without touching equipment.","Compare the methods in the two worked cases. State which information selects each method and check the result against the question."],"scene":"In Ibadan, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain practical: business simulation in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.","examples":["At an assumed power factor of 0.8, 5 kVA corresponds to 4 kW; this is a teaching calculation, not a universal operating allowance.","A visitor sees a warning sign and stays outside the barrier; photographs and questions can document the lesson without entering a live work area."],"question":"At power factor 0.9, what real power corresponds to 5 kVA in a simplified calculation?","options":["5.9 kW","5 kWh","4.5 kW"],"correct":2,"feedback":"Real power = apparent power × power factor: 5 kVA ×0.9 =4.5 kW. kWh would describe energy over time.","practice":"Write three questions for a host about an installation's reliability, avoiding access to live equipment.","solution":"Ask what loads and hours the system is designed for, what maintenance is recorded, and how downtime or alarms are tracked. The answers connect service expectations, preventive work and measured performance.","mistake":"A common error is to ignore this distinction or condition: A 1 kW load for 6 hours needs 6 kWh at the load. The 5 kVA label alone cannot specify required battery capacity.","limitations":["This is an authored recall set, not an official examination or evidence that every topic has been mastered."],"sources":[]},"text":"This is a worked recall session for Solar Photovoltaic Installation & Maintenance. Explain an idea without your notes, use it in an example, then check the method. The two cases below revisit selected concepts. Use the term topic list to plan wider revision.\n\nSTEP BY STEP\n\nRecall the first idea: A 5 kVA proposal describes apparent-power capacity, not daily energy supply. Real power depends on power factor and allowable loading; batteries and PV require a separate energy assessment.\n\nApply and check the contrasting idea: A field visit is structured evidence gathering, with permission, site rules and prepared questions. Record component roles, hazard controls, maintenance records and customer needs without touching equipment.\n\nCompare the methods in the two worked cases. State which information selects each method and check the result against the question.\n\nNIGERIAN–YORUBA SCENARIO\n\nIn Ibadan, Auntie Bisi is reviewing a paper solar-service proposal. Your team must explain practical: business simulation in ordinary language, using the measurements, observations and limits in the worked cases below. Explain your reasons as you would to a family member before making a recommendation.\n\nEXAMPLE 1\n\nAt an assumed power factor of 0.8, 5 kVA corresponds to 4 kW; this is a teaching calculation, not a universal operating allowance.\n\nEXAMPLE 2\n\nA visitor sees a warning sign and stays outside the barrier; photographs and questions can document the lesson without entering a live work area.\n\nCOMMON MISTAKE\n\nA common error is to ignore this distinction or condition: A 1 kW load for 6 hours needs 6 kWh at the load. The 5 kVA label alone cannot specify required battery capacity.\n\nPRACTICE\n\nWrite three questions for a host about an installation's reliability, avoiding access to live equipment."}]}